Обратный звонок
Представьтесь, мы вам перезвоним.
Вход в личный кабинет
Оставить свой отзыв
Расскажите о своём опыте работы с нами.
Прикрепить файлы
Задать вопрос
Менеджеры компании с радостью ответят на ваши вопросы, произведут расчет стоимости услуг и подготовят индивидуальное коммерческое предложение.
загрузка карты...
Onshore design facilities
- Well clusters and single wells
- Well infrastructure development and transfer to artificial oil lift of more than 100 wells in more than 35 fields
- Oil and gas well clusters infrastructure development in the fields of Western Siberia, southern Russia
- Oil and gas gathering pipelines
- Oil and gas gathering and transportation systems development at the “Avilovskoye”, “Matveevskoye”, “Dobroe” fields
- Oil gathering system of Kudinovskoye field
- Upgrade of the natural gas collection system of Saushinskoye and Korobkovskoye fields
- Upgrade and construction of pipelines and oil gathering networks of the Talinskaya area of the Krasnoleninskoye oil and gas condensate field
- Upgrade and construction of OJSC "TNK-Nyagan" pipelines
- Oil pipelines
- Export oil pipeline from the shut-off valves unit to the onshore facilities of V. Filanovskogo field
- Interfield oil pipeline GS “Malyshevsky” - BPS “Alekseevskaya”
- Interfield oil pipeline GS “Rechnoye” - GS “Malyshevsky”
- Oil pipeline GS "Makarovsky" - BPS "Pamyatnaya" - GS "Ovrazhny" – CPF ”Korobkovsky”
- Oil pipeline upgrade BPS "Makarovskaya" - GS-3 "Linevo"
- Oil pipeline upgrade OPF "Ovrazhnoe" - CPF
- Gas pipelines
- Gas pipeline “Landfall – OOO “ Stavrolen ”, V. Filanovskogo field
- Gas pipeline OOO “Stavrolen” - CS “Georgievskaya”
- Gas pipeline GS "Makarovka" - "Korobkovskaya industrial site"
- Gas pipeline upgrade OPF "Yuzhny Umet" - GPP
- Gathering stations CPF, BPS, tank farms
- Onshore facilities for oil intake from V. Filanovskogo field, including a tank farm with a VST of 20,000 m3 (4 pcs.)
- GS “Antipovka”, “Beshkulsky”, “Kudinovka”, “Kletsko-Pochtovoe”
- BPS "Avilovskaya", "Tersinskaya"
- CPF "Korobkovsky"
- Nikolaevskaya oil depot, including tank farm
- Multiphase pumping station upgrade at GS "Klyuchi"
- Construction of process facilities of BPS-0403 "Pikhta" at the OPS-0401 "Pikhta" site
- Reconstruction of the BPS with PWGU “Yuzhny Kyrtael”
Technical upgrade of "Dobroe", "Pamyatno-Sasovskoye", "Molodezhnoye", "Lesnoye", "Nizhnedobrinskoye" fields facilities
- Reservoir pressure maintenance (RPM) system, gas lift facilities
- Formation water discharge, treatment and injection system at GS "Klyuchi"
- Kudinovskoye field RPM system development
- Production bases and sites
- Integrated transport and production base of OOO “LUKOIL-Nizhnevolzhskneft”
- Sub-assembly site of the North Caspian fields hydraulic structures
- Utility facilities
- Power supply facilities and power lines (overhead lines 0.4kV/0.6kV/10kV/35kV)
- Purification of quarry and waste water at Griba diamond deposit
- Communication lines and facilities (FOCL)
- Administrative buildings and transport infrastructure facilities
- Corporate training center in the Astrakhan region
- Rotational camps for servicing V. Filanovsky field onshore facilities and line facilities
- Helipads
- Infield and along-route roads of IV - V category
Gallery
Back to list